Residential construction, start to finish

We are a design-build contractor. That means one contract covering design, permitting and construction, and one company accountable when something goes wrong.

Renovation

Working on an existing house

5-9 months · $180k-$900k

Whole-house renovation

Gut renovation including structural modification, full systems replacement, insulation, drywall and finishes. Often combined with an addition.

8-12 weeks · $65k-$180k

Kitchen renovation

Cabinetry, countertops, appliance integration, plumbing and electrical relocation, flooring and lighting design.

4-6 weeks · $28k-$85k

Bathroom renovation

Complete rebuild with proper waterproofing, ventilation, tile and fixtures. We do not do surface-only bathroom work.

10-16 weeks · $60k-$160k

Basement finishing

Egress, insulation, moisture management, framing and finishes, with permitted bedroom and bathroom additions.

Two ways in

Where most projects start

A site visit in progress

Start with a site visit

Ninety minutes at the property, a conversation about scope, and a written cost range within a week. Free, and no obligation to go further.

Book a site visit →
Drawings on a table

Start with drawings

If you already have an architect, send the drawings. We will price them as they stand and flag anything that will cause trouble on site.

Send drawings →
Building new

Additions and new construction

5-8 months · $220k-$600k

Second storey addition

Structural assessment, foundation reinforcement where required, framing, roof integration and full interior build-out.

4-7 months · $140k-$450k

Rear addition

Ground-floor extension including foundation, framing, systems extension and integration with the existing structure.

4-6 months · $130k-$320k

Garage and ADU

Detached garages and accessory dwelling units, handled through Denver's ADU permitting process.

10-18 months · from $1.1M

Custom home

New construction from architectural coordination through certificate of occupancy, on infill lots or mountain sites.

Project questions

Do we need an architect?

For structural changes and additions, usually yes, and we coordinate directly with them. For kitchens and bathrooms our design lead handles it in-house.

Can we live in the house during work?

For a kitchen or bathroom, often yes. For a whole-house renovation, almost never, and we will be honest about that in the proposal rather than after demolition.

How far out are you booking?

Typically three to five months for projects over $150,000, less for bathrooms. Design phase can start sooner.

What warranty do you give?

Two years on workmanship in writing, plus manufacturer warranties on materials and fixtures. We return for warranty work; it is not an argument.